This is the northwest corner of the building. Much of the sheet metal needed to be removed to make way for the masonry and several new windows. This area will house the showroom on the first floor and Design, Customer Service and Service Dispatch on the second floor.
The future front lobby entrance. This area will receive a canopy and improvements to match the existing front corner. If you look closely you can see the elevator shaft and some of the duct work inside.
Here's the northeast corner and again masonry and windows are being added. The first floor front office area will house the Marketing and Purchasing groups. The remainder of the floor level will feature a 60' x 74' lunchroom, directly outside a 72' x 24' outside eating area, and directly across the parking lot the smoking area. Additional parking will be added the entire length of the building. The second level will be home for the TIS groups.
The west side where eight dock doors are being removed, masonry and windows are being added for the conversion into office space.
*Thanks to Sharon Fiorini for the pictures and Mike Mangan for letting us know what we're looking at!
No comments:
Post a Comment