The big development this week -- we now have a generator. The 14,000-pound generator was
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgrvgrMwFSyvvMF_VvP5ElRH0DhgGgR77pBaO3BZuyPkBirB04Bk0Rojp4jIGzA2t2w7tksC0JK1_Wvqg8mJmoBQYRh-gqgR7H-C0W9BZ1cHs4781QS1bZIBC4AK0s5dYBPjMYfyMOldloV/s200/DSC_0141.JPG)
delivered and placed on Tuesday, and Sharon was there to capture the action. With the help of a crane (and Bob Hunt) the generator was placed without incident.
Sharon also made her way around inside and got some shots of a couple rooms we haven't gotten to see much of. On the left is the in-progress boiler room and on the right is the second floor office area.
*Click the images to see them full size*
No comments:
Post a Comment